A week in production: what really slows delivery (and how teams fix it)

Every “late” campaign usually has the same root causes - just with different costumes.

The usual blockers

  1. The brief wasn’t final
    • Specs changed mid-build
    • Messaging changed after design started
  2. Feedback came from everywhere
    • Multiple stakeholders commenting in different places
    • No single approval owner
  3. QA happened too late
    • Truncation, legals, click behaviour found at the end
    • Result: rebuild under time pressure

The fixes that actually work

What to do next

Start with the brief template: /templates/creative-brief-template/
Then tighten approvals: /guides/approval-workflows/